As I am visiting customers, I always make a trip to the production line to assess productivity. My feeling is that the better their productivity the happier they will be with the components that I am selling them and the more they will potentially use.
There are three factors that I look for as I am observing the production line. These are productivity killers and I call them the three Ws: walking, waiting and wondering.
Walking
Walking is the first major productivity killer. How many steps is each associate taking during an eight-hour shift as he or she goes about his or her tasks on the production line? Each time they must physically walk a component from point A to point B is time wasted and physical energy. The associate is becoming more tired, and more time is spent moving work in process down the production line.
A good way to complete an efficiency evaluation is to have your associates all wear pedometers and measure how many steps they are taking while working the line during an eight-hour shift. Then, evaluate what can be done to reduce the number of steps down to a minimum. It may require rearranging stations of the production line or adding a conveyor or material handling system. If samples are being walked over to the lab and periodically tested, then consider relocating the test machine adjacent to the production line so that tests can be conducted immediately without delay.
Waiting
The second W is Waiting. If one section of the production line is operating at a slower pace, then downstream operations will constantly be waiting for in-process inventory to show up at their station. This not only stalls the overall pace of the line but creates boredom which consequently results in frustration and a lack of focus. I like to take my chronograph wristwatch with me when I visit my customers’ production lines. It features a tachymeter which I can use to record the exact number of units per hour that are being processed at each stage of the production process. This tells me the pace that each section of the line is maintaining. For example, on an insulating glass (IG) line, if the spacer applicator is achieving a pace of 160 units per hour but the person installing the grids is inserting them at the pace of 100 units per hour, then the supervisor needs to find a way to beef up the grid installation to achieve maximum productivity because the overall line will never achieve results faster than the slowest operation being conducted.
As it relates to IG, one of the biggest challenges in this regard is the gas filling process which can be very time-consuming, especially with larger units. Even on completely automated lines, it tends to oftentimes be the bottleneck. It must be done fast enough but must also be done correctly to achieve at least 90% fill rates on a consistent basis. The gas filler must be calibrated periodically, or the line might be putting out units that are thought to be adequately filled but are below industry standard levels for Argon. I carry a Sparklike tester with me to help assess the accuracy of my customers’ gas filling techniques so they can initiate process modifications if fill rates have fallen below 90%.
Wondering
The last W is Wondering. The most productive lines are those that have explicit instructions complete with photographs and written guidelines showing what each associate should look for as it relates to the quality of the items leaving their workstation. There is no wondering what is acceptable and what is not as the pictures and guidelines explain exactly what they should do in each instance. There are also training sessions given separately on how to handle work stoppages. When the line goes down it is critical to understand the top five reasons for the stoppage and the corrective actions that must be taken immediately to get things running smoothly again. If this is handled ahead of time in routine training sessions, then no one is standing around wondering what to do when a stoppage occurs or a quality issue is encountered. The team goes right to work to fix the problem and to get the line back into production as soon as possible. A good rule of thumb is that manufacturing organizations should spend between 1% to 5% of their total salary expense on training. Given the challenges of staffing a highly motivated manufacturing team these days, I would recommend leaning toward the high end in this regard. The result will be a more productive workforce, less downtime, improved quality, and a significant boost in employee morale.
So, there you have it. Addressing the three Ws can keep your manufacturing line operating at peak performance, allowing you to achieve the best possible production efficiency while maintaining a highly motivated manufacturing team. A successful team is a happy team!

Improving production efficiency is such a critical topic right now, especially when dealing with the logistical demands of high-end project management. We’ve been looking at similar optimization strategies over at https://qualityrenovation.com/services/luxury-home-remodeling to ensure that custom timelines don’t slip when high-grade materials are delayed. It’s a constant battle to balance that “just-in-time” delivery with the precision required for bespoke residential work.