Lumbermen’s Door Division has moved to a new location in Byron Center. They have announced that all functions are now working out of their new location.

The new facility is a 60,000 square foot space designed by manufacturing engineers to ensure the best possible flow. The new location is approximately 30 percent larger than their previous space, including 24 foot ceilings, which adds 10 feet of height to their warehouse. They have also invested in new machinery and technology to speed up efficiency.

The new location will allow for increased production, larger storage capacity, and timely delivery.

News

Leave a Reply

Your email address will not be published. Required fields are marked *